|
Public Comments Received - April 2-3 & 9, 2008
Public Meeting Exhibits, April 2-3 & 9, 2008
This page includes maps of all improvement alternatives
developed throughout the study. Note the dates in the headings
to view the most recent information.
The study's environmental document will
include maps of improvements being recommended in this section.
Click on the "Documents" link
above to view the environmental document.
Warning: These maps are
very large and can be difficult to view or download. If you have
trouble, call the project office at 1-800-590-0066.
To view the basic location for I-70 widening,
click on "Widening Locations" to the left.
Public Meetings, November 18 & 19, 2003
Station 1
Why
We’re
Here (168KB pdf)
Station 2
Improve
I-70 Background (285KB pdf)
Station 3
Study
Process (2.7MB pdf)
Station 4
Widening
I-70 (824KB pdf)
Interchanges
and Access (423KB pdf)
These maps display very preliminary ideas
for improving I-70 in the area between Kansas City and Odessa.
Where there are multiple
alternatives for an interchange, numbering is random and does not
indicate any preference. With input from the public, the Section
1 Team is now working evaluate and refine the preliminary alternatives.
Next year, a public hearing will be held to gather input on the
draft Environmental Assessment’s findings and the recommended
preferred alternatives.
Station 5
What’s
Next (163KB pdf)
|