header Improve i70 logo Missouri Department of Transportation
 

Section 2 - Schedule

Home  •  News  •  Events  •  Documents  •   Maps  •  Schedule

Improve I-70 studies began in 2002. Each study has its own process and timeline, but all are expected to be complete in early 2005. The studies will result in all the necessary documentation needed to proceed to the next steps: detailed design and construction.

Currently no funding is allocated for design or construction. Therefore, the timeframe for long-range improvements is unknown.

Section 2 is conducting an Environmental Assessment (EA) study. An EA is conducted when the degree of environmental impact resulting from corridor improvements is yet unkown. An EA will result in either a Finding of No Significant Impact (FONSI), or an Environmental Impact Statement (EIS).

For information on section meetings and other events, see the events section.

 

Copyright 2002-2006 Missouri Department of Transportation. All rights reserved. Web site developed by HNTB Technology. HNTB Technology Missouri Department of Transportation