| Improve
I-70 studies began in 2002. Each study has its own process
and timeline, but all are expected to be complete in early
2005. The studies will result in all the necessary documentation
needed to proceed to the next steps: detailed design and construction.
Currently no funding is allocated for design
or construction. Therefore, the timeframe for long-range improvements
is unknown.
Section 1 is conducting an Environmental Assessment
(EA) study. An EA is conducted when the degree of environmental
impact resulting from corridor improvements is yet unkown. An EA
will result in either a Finding of No Significant Impact (FONSI),
or an Environmental Impact Statement (EIS).
For information on section meetings and other
events, see the events
section.
|