|
|||||||||||||||||
|
Improve I-70 studies began in 2002. Each study has its own process and timeline and were completed in 2006. The studies developed the necessary documentation needed to proceed to the next steps: detailed design and construction. Currently no funding is allocated for design or construction. Therefore, the timeframe for long-range improvements is unknown. Visit the Local Focus page to view the study schedule for each section.
|
|||||||||||||||||
|
|||||||||||||||||